본문 바로가기

Services

Explore the services we offer to help provide top-quality healthcare.

Site planning

Digital X-ray radiography system Site planning

Perfection in Quality beyond your imagination

Site planning will be an aid to customer easy understanding Samsung healthcare standard layout and determine your own space.

  • Sales team consult purchasing information and clinical information.
    www.samsungmedicalsolution.com
  • Please contact site plan center when you need roomlayout or site planning information
    e-mail
    siteplan@samsungmedison.com
    Tel
    +82.2.2194.0889
  • It must be consulted with the person who in charge of installation samsung healthcare.
  • Radiation protection is needed that meet national or local code.
  • Radiation protection should be specified by Qualified Radiological physicist.

Perspective Room Layout

Room Layout

Video

Standard Layout

standard_layout
Site environment
Ambient operation temperature 10°C ~ 40°C
Ambient operation humidity 30 ~ 75 % NON CONDENSING
Ambient operation pressure 70kPa ~ 106kPa v

Item description

Item description
ITEM ITEM NAME
1 PATIENT TABLE
2 WALL STAND
3 GENERATOR
4 CEILING RAIL
5 CEILING-MOUNTED TUBE HEAD
6 WORK STATION
7 CIB
50 LEAD SHIELD DOOR
51 X-RAY WARNING ON LAMP WHEN EXPOSURE
52 DOOR SWITCH
53 LEAD GLASS
54 LEAD SHIELDED WALL
55 POWER DISTRIBUTION
56 COUNTER TOP FOR WORKSTATION
Item description
ITEM WEIGHT HEAT OUTPUT LOCATION
1 200kg 600W FLOOR FINISH.
2 150kg 150W FLOOR FINISH.
3 100kg 3.460W FLOOR FINISH.
4 N/A 0W CEILING FINISH.
5 280kg 560W CEILING FINISH.
6 N/A 0W CONTROL RM.
6 N/A N/A CONTROL RM.
50 DOOR
51 DOOR
52 DOOR
53 EXAM ROOM
54 EXAM ROOM
55 EXAM ROOM
56 CONTROL RM.
Item description
ITEM ITEM NAME WEIGHT HEAT OUTPUT LOCATION
1 PATIENT TABLE 200kg 600W FLOOR FINISH.
2 WALL STAND 150kg 150W FLOOR FINISH.
3 GENERATOR 100kg 3.460W FLOOR FINISH.
4 CEILING RAIL N/A 0W CEILING FINISH.
5 CEILING-MOUNTED TUBE HEAD 280kg 560W CEILING FINISH.
6 WORK STATION N/A 0W CONTROL RM.
7 CIB N/A N/A CONTROL RM.
50 LEAD SHIELD DOOR DOOR
51 X-RAY WARNING ON LAMP WHEN EXPOSURE DOOR
52 DOOR SWITCH DOOR
53 LEAD GLASS EXAM ROOM
54 LEAD SHIELDED WALL EXAM ROOM
55 POWER DISTRIBUTION EXAM ROOM
56 COUNTER TOP FOR WORKSTATION CONTROL RM.

SAMSUNG EQUIPMENT

CUSTOMER / CONTRACTOR SUPPLIED AND INSTALLED ITEMS

Power requirement
Voltage 3-phase 400VAC ± 10% 50 Hz ~ 60 Hz
Single phase 230VAC ± 10% 50 Hz ~ 60 Hz
Wire Configuration 3 wire power and ground
Circuit breaker 3 pole , 100A